The original tile project began in 1998 with the tiling of the main and side altars.  10 intrepid individuals started on that project and 5 survived until the last day of that phase.  These 5 survivors also were involved in the 2004 tile project which put down tile on the main floor of the church.  Amazingly, those same 5 are still involved with the current and last phase of the tile project, taking care of the steps leading up to the altar.  Those 5 are Tom Farrell, David Hemmi, Dave Williams, Eric Rochester and John Farrell.


Day One, Saturday

 

The middle being done.

Wow, lots of tile to be laid still.

Lots of tile to be laid, part 2, different perspective.  Besides, what else would I take a picture of at this time?

Either a butt shot or floating a rough spot on the floor.

The ooze.  Could be a movie.

Let's think about this.  Too late, carpet is gone.  Must tile.


Day Two, Sunday


Waiting to get in to do the work.


Getting ready to get in the church.

Laying out the tile in preparation.


Getting set up.


Almost finished with the setup.

Here is our progress on the north side at 10 pm.

Here is our progress on the south side at 10 p.m.


Here is our north progress at 11 pm.  Pretty good!


Here is our south progress at 11 pm and apparently an obligatory butt shot.

Really is looking good at 11 pm.

The tile cutting station.

Heck, where is everyone?

Oh there they are.  Union rules, breaks have to be given.  Babies.

Well we knocked of at 1 am.  Not bad.


Day Three, Monday


Getting going on the south side.


Here is where the day started off on the north end.

The south area, getting there.

The north area, almost done.

I worked here for a time today.

Cleaning up, early tonight, 11:30.


Day Four, Tuesday


Look, it takes 2 people to finish the steps I started and got to this point.


North done, ready for grout.

South almost to the steps, starting to grout from here moving north.

The front is also done and awaiting grout.

We are even fixing some old problems.

Cutting the radius.  Next, grinding it.


Day Five, Wednesday


Cleaning grout.


Laying tile and buffing.

All this clown needs is a red nose and big shoes.
 


Day Six, Thursday


Looking north.


Looking south.

Cleaning up.  Lots of dust.
 

 